Ballard Bathroom Project


We remodeled a combined large walk-in shower and tub area. Highlights of the project included:

  1. We carefully removed existing tub, shower fixtures, glass door. We removed the glass panel and set aside for reinstall later.
  2. We removed all existing tiles from the walls, pan and curb down to the studs and subfloor.
  3. We built a new custom tiled shower and large tiled shower pan for the combined shower and tub.
  4. We installed Moroccan shape/pattern tiles on the shower walls with subway tiles to match the color on the shower curb and edge trim tiles around the exposed edges of the niches.
  5. Built-in tiled niches for tub and the shower with deco mosaic tiles on the back of the niches.
  6. Reinstalled existing tub and shower fixtures.
  7. Reinstalled shower door and panel.


Share by: