Tacoma Bathroom Project


We remodeled a bathroom. Highlights of the project included:

  1. We removed existing tub and framed deck, all tiles from floor, the vanity cabinet unit, and the one-piece shower unit.
  2. We built a new custom tiled shower, walls, pan, curb, and niche.
  3. We installed subway tiles on the shower walls and continued same tile around the entire room as a tiled wainscoting.
  4. New plumbing, electrical and HVAC works for new bathroom layout and configuration.
  5. We installed large format hex tiles on the bathroom floor.
  6. Installed new vanity cabinet unit with two built in medicine cabinets and two light sconces centered above.
  7. New stand-alone tub, with floor mount tub filler. 
  8. Drywall repair, new paint, and mill work in the entire room.
  9. Installed new heavy duty glass shower door hinged with HD clamps.


Share by: